The brick bridge linking High Street with Bridge Street was designed by John Rennie and built in 1799. For the first 100 years of its life it carried nothing heavier than horses and wagons. Through the 20th century and onwards, however, it had to support increasingly heavy vehicles.

The beautiful construction, with its many curves, has proved amazingly strong and robust. The bridge was strengthened in the early 2000s - a magnificent piece of work, totally invisible after the event!

Since the 1950s, however, there had been anxieties about the dangers of pedestrians crossing the bridge on the narrow pavements, and the risks of being hit by passing vehicles.

After many discussions, meetings and failed plans, a scheme was agreed in 2011 (see NWN article "Footbridge plan is finally approved"). Through the winter of 2011-12 a new pedestrian bridge was constructed, on the west side of the existing bridge, but totally independent of the brick bridge.

Ground works were completed by Christmas 2011, and the new bridge structure (fabricated in Huddersfield) was craned into position (using a 200-ton crane) on the night of 2/3 Mar 2012.

The projected cost of the Jubilee Footbridge (named to honour Queen Elizabeth II’s Diamond Jubilee) was £400,000.

The bridge was officially opened on the 2nd June 2012 by Mrs. Mary Bayliss, the Lord Lieutenant of Berkshire.

Photo Gallery:

img_0046
img_0046

Diamond Jubilee Footbridge in place May, 2012

20110310 - nwn canal footbridge 01
20110310 - nwn canal footbridge 01

CAD impression of the proposed pedestrian bridge - NWN 10 Mar 2011

20110310 - nwn canal footbridge 02
20110310 - nwn canal footbridge 02

CAD impression of the proposed pedestrian bridge - NWN 10 Mar 2011

20110310 - nwn canal footbridge 03
20110310 - nwn canal footbridge 03
img_6958
img_6958
img_6958
img_6958
img_6971
img_6971

The new bridge being craned into position 2-3 Mar 2012

Jubilee footbridge
Jubilee footbridge

Jubilee footbridge (with thanks to Dr Jimmy Whittaker)

- Diamond Jubilee Footbridge in place, May 2012.

- CAD impression of the proposed pedestrian bridge - NWN 10th March 2011.

- The new bridge being craned into position, 2nd-3rd Mar 2012.

- The finished Jubilee footbridge (with thanks to Dr Jimmy Whittaker).